Resources
BNET Resources
- sort by:
- Relevance
- Date
- Popularity
- Patuxent River Naval, Air Station, Maryland
- As far back as the late 1980's, the base energy manager at Patuxent River began exploring the economic benefits of GeoExchange. But at the same time, there was not widely understood in the US, and installation costs were higher than most conventional systems, even though operating costs were lower. At...
- Case studies
- Health and Human Services, York County, Virginia
- As York County, Virginia, officials planned their new Health and Human Services HHS building; they wanted to achieve a number of goals besides providing office space for the medical, dental, and administrative staff. A 100-ton GeoExchange system was fundamental to reducing operating costs, maintenance, and the amount of space devoted...
- Case studies
- Fr. Michael McGivney Senior High School, Markham, Ontario
- The Father Michael McGivney Senior High School in Markham, Ontario, Canada, where the GeoExchange system was installed, uses almost half the energy of Holy Cross School in nearby Toronto, and pays about $10,000 less in annual energy costs. The system at Father McGivney provided other benefits as well. Because heat...
- Case studies
- Whitman College, Walla Walla, Washington
- Whitman College is an independent liberal arts college located in Walla Walla, Washington that serves 1,300 students. The college uses a groundwater-based GeoExchange system to heat and cool the science building and the administration building, and to provide condenser cooling for the library. The college administration is supportive of the...
- Case studies
- White Horse Village: Newton Square, Pennsylvania
- White Horse Village is a unique residential life care community for people 65 and over who want to maintain their active, independent lifestyle while having the added assurance of total lifetime health care, when needed. This sprawling community is served by a GeoExchange geothermal heating and cooling system. Unit types...
- Case studies
- Martin & Kroencke Implement, Inc.: Quincy, Illinois
- Lewis Martin, Jr. and Mike Kroencke have each owned farm implement businesses since the 1970s. The owners wanted a system with as few moving parts as possible to get in the way of employees and customers, no outside clutter and cost-effective operation. Morton's Jim Hills served as general contractor. After...
- Case studies
- West Philadelphia Enterprise Center
- The West Philadelphia Enterprise Center, located in urban Philadelphia, was the original home of the American Bandstand television show. A life-cycle cost LCC analysis of the Center's proposed GeoExchange system versus a water-source heat pump system with an electric boiler and cooling tower was conducted by Alderson Engineering, Inc., of...
- Case studies
- Ohio's Health House Provides Asthma-Free Indoor Living
- The Dublin Health House is the result of a partnership between the American Lung Association and area builder, C.V.Perry. The A.L.A. has built 18 similar homes in 11 states. American Electric Power, a Health House sponsor, selected Geo Source One to install the home's geothermal system. AEP also covered the...
- Case studies
- The Middleton Corporation: Akron, Ohio
- Middleton Corporation is in the business of providing heating and cooling solutions to commercial companies. An Akron-area plumbing and heating contractor, Middleton has installed large-scale GeoExchange projects across the state. When faced with replacing its own heating and cooling system, the management at Middleton looked carefully at all their options....
- Case studies
- << Previous
- page 1 of 1
- Next >>