Resources

5 Resources for

lusas and outsourcing

  • Subscribe to this listing via:
  • RSS
  • Email

BNET Resources

Offshore Centralizer Design
UWG Ltd provides a consulting engineering design, fabrication and offshore service for the oil and gas industry. LUSAS Analyst is used to carry out detailed analyses of centralizer designs to investigate their ultimate strength and fatigue life. Use of the LUSAS sideline facility simplifies modeling the contact between the centralizer...
Tags: LUSAS, Outsourcing, Research & Development, It Operations, Business Operations, Outsourcing & Subcontracting
Case studies
Support Hinge Assemblies for the Gateshead Millennium Bridge
The Gateshead Millennium Bridge, designed by consulting engineers Gifford and Partners with Wilkinson Eyre, is an eye-catching, steel, opening bridge that spans 105m across the River Tyne. When closed, small river craft can sail beneath the bridge but, for larger vessels, the cable-stayed double arched structure pivots at the abutments...
Tags: LUSAS, Outsourcing, Cable, Network Technology, It Operations, Business Operations, Outsourcing & Subcontracting, Telecommunications, Personal Technology, Networking
Case studies
Millennium Bridge
Whitby Bird and Partners, based in London, is a multi-disciplinary consulting engineering firm at the leading edge of technology and innovation. Their competition-winning design for the York Millennium Bridge across the River Ouse was inspired by the spokes of a bicycle wheel and consists of an inclined arch with radially...
Tags: LUSAS, Engineering, Outsourcing, Cable, Leadership, It Operations, Business Operations, Outsourcing & Subcontracting, Telecommunications, Personal Technology, Management
Case studies
Dynamic Analysis of the Royal Victoria Dock Bridge
Consulting Structural Engineers, Techniker Ltd, won a competition sponsored by the London Docklands Development Corporation to design a footbridge to span the Royal Victoria Dock in London. To help evaluate the dynamic response of the structure LUSAS Bridge was used. The global member loads and deflection envelopes obtained from the...
Tags: LUSAS, Analysis, Outsourcing, It Operations, Business Operations, Outsourcing & Subcontracting
Case studies
Cost-Effective Bridge Assessment
Many steel bridges have been shown to fail assessment to design code BS5400 Part 3. Two consulting firms, both using LUSAS Bridge have proved a 40 tone capacity on a structure that, according to the code, had insufficient lateral restraint and would have required a severe weight restriction. By using...
Tags: LUSAS, Research & Development, Outsourcing, Business Operations, It Operations, Outsourcing & Subcontracting
Case studies
  • << Previous
  • page 1 of 1
  • Next >>
advertisement
advertisement